WorkPac are currently seeking a Concreter/Carpenter for the Battery Energy Storage for Spinning Reserve project in Tom Price. This is currently on a 2 weeks on 1 week off roster from Perth to Tom Price. This project is going for 4-5 months. You will be paid $52 per hour doing 12 hour days. Immediate start.
Scope of Work
Installation of an energy storage spinning reserve at Tom Price.
Removal of all unsuitable material, supply, and installation of suitable material.
Installation of footing and over 150 bored piles maximum of 3 metres in depth.
Installation of slabs, apron slabs, lighting foundations, staircase landings.
Installation of precast concrete pits, 100m precast concrete trench.
Installation of 6 transformer slabs, switch room footings, gen set, load bank and fuel tank slabs.
Installation of cable ladder supports, underground conduiting works.
Trenchin
Carpenter
Job title: | Carpenter |
Contract type: | Casual |
Location: | Perth |
Industry: | Concrete, Cement and Stone Trades & Services |
Job expiry: | 2022-01-03 |
Reference: | 764J202175769 |
Expired job