Blank
BACK TO JOB SEARCH

Fixed Planner

Based at Dampier, FIFO from Perth 5:2, 4:3 roster 6 month duration with potential to extend. About our client: Rio Tinto operates the world???s largest integrated portfolio of iron ore assets. These assets include a world-class, integrated network of 15 iron ore mines, four port facilities, a 1,700 kilometre rail network and related infrastructure. Rio Tinto are expanding operations in the Pilbara to epic proportions while introducing next generation technologies to deliver greater efficiency, lower production costs and improved health, safety and environmental performance. About the Role: WorkPac are currently seeking an experienced Workshop Mechanical Planner for a position based at Dampier mine site, FIFO from Perth. This role will be on a 5:2, 4:3 roster, for a 6-month duration. What you will be doing: Planning work of all our repairable s, Chutes, Bogie Assemblies, Gearboxes Reading fabrication drawings to scope, plan and provide estimation of cost o
Job title: Fixed Planner
Contract type: Casual
Location: Regional WA - Port Hedland, Karratha & Pilbara, Regional WA
Industry: Construction & Architecture Planning
Job expiry: 2022-05-29
Reference: TMPRIJ202270867

GET NEW JOBS FOR THIS SEARCH BY EMAIL

Expired job

Track Application

Download the myWorkPac app to start tracking your job application.

DOWNLOAD APP

SHARE THIS JOB

LATEST JOBS